Subsea 7

MAD DOG PROJECT

Project Description

The Mad Dog Phase 2 project is the second stage of development of the Mad Dog offshore field operated by BP. The Mad Dog field was discovered in 1998 and started production in 2005. The Phase 2 has been planned as an extension to BP’s biggest discovery in Gulf of Mexico.

Project Starting Date

01.09.2017

Project EndIn Progress

Category

Engineering Procurement and Commissioning

Customer Expectation

BP after revised design for the Mad Dog project managed to reduced project costs from $22bn to $10bn and the challenge was to supply modules to high specification with minimal costs.

On this challenge Hamall managed to supply a full instrumentation package that meet BP specifications and change some of the manufacturers construction detail to contribute in meeting the challenges our customer requested for the project.

rosemount-3144p-temperature-transmitter-4-assembly-sis

Scope of Work

Pressure Gauges, Level Gauges, Radar Level,  Magnetic Flow Meters,  Pressure gauges, Temperature Transmitters, Analytical Equipment.  All items FM certified for the gulf of Mexico

  • Financial Responsibility to Our Clients
  • Superior Quality and Craftsmanship
  • Quality and Value to the Projects We Deliver
  • Highest Standards in Cost Control

Contact us now to see how we can provide a solution ... We Are Available For You

Request A Quote